Stormwater Projects typically include hydrology, hydraulics, field surveys, structural design, preparation of plans and maps, construction cost estimates, reports and attendance at meetings with local officials and the public. Completed studies have included evaluation of existing facilities, analysis of improvement alternatives and development of recommended plans.

Stormwater management plans include the preparation of regional watershed studies for the development of area-wide stormwater quantity and quality mechanisms for the control of increased runoff and pollutants resulting from land development and redevelopment. Personnel have also performed site specific stormwater control plans at various industrial complexes involving stormwater sampling and analyses and the development of mitigation measures for the control of water quality during rainfall events.